Abstract

The study will result in a range of benefits at both financial and economic to the community concerned, using electricity from renewable sources, photovoltaic panels being directly connected to the grid via transformers so without energy storage, but also by alteration in angle inclination of the panels for hot and cold season. The main objective is to cover part of the electricity for community energy obtained through panels polycrystalline photovoltaic and as a secondary objective of this photovoltaic power plant is to reduce environmental impact by replacing electricity produced in power plants with electricity from renewable energy sources, and use this energy in daily activities.

References

Downloads

Published

2015-12-31

How to Cite

CASE STUDY REGARDING THE REALIZATION OF A SOLAR PARK IN MIERSIG, BIHOR, ROUMANIA. (2015). Nonconventional Technologies Review, 19(4). http://www.revtn.ro/index.php/revtn/article/view/174